Total Expenditure
$57.8m
2023-24
Capital Works
$13.9m
24.1% of expenditure
Governance Spend
$15,990,860
Local Roads Spend
$9,874,224
Governance / Roads
1.62x
spending more on itself
State Rank (Expenditure)
#57
of 79 councils
State avg expenditure: $147.1m This council: $57.8m State avg capital: $44.4m This council: $13.9m
Per Capita (population: 20,025, 2023)
Expenditure / Resident
$2,888
Capital / Resident
$696
Governance / Resident
$799
Roads / Resident
$493
Expenditure Trend (9 Years)
Capital Works by Function (2023-24)
Expenditure by Function Over Time
Service Performance (ESC Rate Capping Outcomes)
Community Satisfaction
0.4
State avg: 0.5
#75 of 78
Roads Condition
1.0%
State avg: 1.0%
Bins Missed / 10k
0.6
State avg: 6.3
Employee Costs / Capita
$1,298
State avg: $915
Asset Renewal vs Depreciation
0.6%
running down assets
Satisfaction & Roads Condition
Employee Costs Per Capita & Bins Missed
Performance Indicators (LGPRF 2024-25)
Efficiency 2 indicators ▾
ID Indicator Result State Avg Trend
E2 Expenses per property assessment 4683.7 4166.8
E4 Average rate per property assessment 1851.5 1951.9
Governance 5 indicators ▾
ID Indicator Result State Avg Trend
G1 Council decisions made at meetings closed to the public 0.2 0.1
G2 Satisfaction with community consultation and engagement 43.0 55.0
G3 Councillor attendance at council meetings 0.9 0.9
G4 Cost of elected representation 75445.7 62511.3
G5 Satisfaction with council decisions 42.0 54.0
Roads 5 indicators ▾
ID Indicator Result State Avg Trend
R1 Sealed local road requests 4.1 58.2
Council says: A decrease in this measure reflects Council's improved maintenance response times, which have led to fewer requests being logged over the period.
R2 Sealed local roads maintained to condition standards 0.9 1.0
R3 Cost of sealed local road reconstruction 48.8 132.1
Council says: Increases in the cost of road construction is attributed to rising material prices.
R4 Cost of sealed local road resealing 6.3 19.9
Council says: Increases in the cost of road resealing is attributed to rising contractor prices.
R5 Satisfaction with sealed local roads 34.0 50.5
Statutory Planning 4 indicators ▾
ID Indicator Result State Avg Trend
SP1 Time taken to decide planning applications 36.0 72.3
Council says: Council experienced a greater proportion of Vicsmart Applications combined with a lesser amount of regular applications, driving down the median timeframe.
SP2 Planning applications decided within required time frames 0.9 0.7
SP3 Cost of statutory planning service 2741.8 3907.9
SP4 Council planning decisions upheld at VCAT 1.0 0.6
Waste Collection 4 indicators ▾
ID Indicator Result State Avg Trend
WC2 Kerbside collection bins missed 0.0 6.3
WC3 Cost of kerbside garbage bin collection service 199.1 145.4
WC4 Cost of kerbside recyclables collection service 110.5 76.8
WC5 Kerbside collection waste diverted from landfill 0.3 0.5