Total Expenditure
$156.8m
2023-24
Capital Works
$83.6m
53.3% of expenditure
Governance Spend
$49,436,883
Local Roads Spend
$18,292,918
Governance / Roads
2.7x
spending more on itself
State Rank (Expenditure)
#29
of 79 councils
State avg expenditure: $147.1m This council: $156.8m State avg capital: $44.4m This council: $83.6m
Per Capita (population: 133,248, 2023)
Expenditure / Resident
$1,176
Capital / Resident
$627
Governance / Resident
$371
Roads / Resident
$137
Expenditure Trend (9 Years)
Capital Works by Function (2023-24)
Expenditure by Function Over Time
Service Performance (ESC Rate Capping Outcomes)
Community Satisfaction
0.7
State avg: 0.5
#12 of 78
Roads Condition
1.0%
State avg: 1.0%
Bins Missed / 10k
3.4
State avg: 6.3
Employee Costs / Capita
$421
State avg: $915
Asset Renewal vs Depreciation
1.7%
running down assets
Satisfaction & Roads Condition
Employee Costs Per Capita & Bins Missed
Performance Indicators (LGPRF 2024-25)
Efficiency 2 indicators ▾
ID Indicator Result State Avg Trend
E2 Expenses per property assessment 3336.3 4166.8
Council says: The increase in expense per property was mainly due to higher material and service costs, asset write-offs, and storm recovery efforts. These were mainly driven by works on non-Council owned facilities, unplanned infrastructure adjustments, and external project impacts.
E4 Average rate per property assessment 1880.2 1951.9
Governance 5 indicators ▾
ID Indicator Result State Avg Trend
G1 Council decisions made at meetings closed to the public 0.0 0.1
Council says: Demonstrating Council’s commitment to transparency, fewer than 5% of decisions made this year were confidential, with clear explanations and subject details publicly available in the relevant meeting minutes.
G2 Satisfaction with community consultation and engagement 69.0 55.0
G3 Councillor attendance at council meetings 0.9 0.9
G4 Cost of elected representation 60171.3 62511.3
G5 Satisfaction with council decisions 65.0 54.0
Roads 5 indicators ▾
ID Indicator Result State Avg Trend
R1 Sealed local road requests 58.4 58.2
R2 Sealed local roads maintained to condition standards 1.0 1.0
R3 Cost of sealed local road reconstruction 178.3 132.1
R4 Cost of sealed local road resealing 6.5 19.9
Council says: Council has benefitted from improved tender rates and approaches to market, resulting in lower purchasing costs.
R5 Satisfaction with sealed local roads 63.0 50.5
Statutory Planning 4 indicators ▾
ID Indicator Result State Avg Trend
SP1 Time taken to decide planning applications 143.0 72.3
SP2 Planning applications decided within required time frames 0.5 0.7
Council says: Council has seen improved timeliness in planning decisions, supported by stabilised application volumes and ongoing enhancements in processing. A review of the methodology used to calculate performance was undertaken which has also impacted this performance measure.
SP3 Cost of statutory planning service 3509.3 3907.9
SP4 Council planning decisions upheld at VCAT 0.9 0.6
Council says: This result is always highly variable given the small number of cases that proceed to VCAT and the specific nature of each case.
Waste Collection 4 indicators ▾
ID Indicator Result State Avg Trend
WC2 Kerbside collection bins missed 3.1 6.3
WC3 Cost of kerbside garbage bin collection service 140.1 145.4
Council says: Council has re-tendered the recycling processing contract and established a cost saving in this space. This saving is reflected in the overall cost of running kerbside services.
WC4 Cost of kerbside recyclables collection service 67.9 76.8
WC5 Kerbside collection waste diverted from landfill 0.5 0.5