Total Expenditure
$98.4m
2023-24
Capital Works
$33.7m
34.2% of expenditure
Governance Spend
$19,951,501
Local Roads Spend
$28,847,066
Governance / Roads
0.69x
State Rank (Expenditure)
#45
of 79 councils
State avg expenditure: $147.1m This council: $98.4m State avg capital: $44.4m This council: $33.7m
Per Capita (population: 38,510, 2023)
Expenditure / Resident
$2,555
Capital / Resident
$874
Governance / Resident
$518
Roads / Resident
$749
Expenditure Trend (9 Years)
Capital Works by Function (2023-24)
Expenditure by Function Over Time
Service Performance (ESC Rate Capping Outcomes)
Community Satisfaction
0.6
State avg: 0.5
#26 of 78
Roads Condition
0.9%
State avg: 1.0%
Bins Missed / 10k
0.5
State avg: 6.3
Employee Costs / Capita
$926
State avg: $915
Asset Renewal vs Depreciation
1.4%
running down assets
Satisfaction & Roads Condition
Employee Costs Per Capita & Bins Missed
Performance Indicators (LGPRF 2024-25)
Efficiency 2 indicators ▾
ID Indicator Result State Avg Trend
E2 Expenses per property assessment 5181.1 4166.8
E4 Average rate per property assessment 2034.9 1951.9
Governance 5 indicators ▾
ID Indicator Result State Avg Trend
G1 Council decisions made at meetings closed to the public 0.1 0.1
G2 Satisfaction with community consultation and engagement 56.0 55.0
Council says: Council's consultation and engagement rating remained at 56% for the second year in a row, the highest level of satisfaction for Council since 2015. Consultation and engagement have been undertaken across many council service areas and included major engagement around …
G3 Councillor attendance at council meetings 1.0 0.9
G4 Cost of elected representation 75749.6 62511.3
G5 Satisfaction with council decisions 52.0 54.0
Council says: Although there was a small drop in the result, shared by Councils across Victoria, the 2025 Community Satisfaction Survey continues the overall trend of increase in satisfaction with Council's decision making in the interests of our community. Council's score exceeds …
Roads 5 indicators ▾
ID Indicator Result State Avg Trend
R1 Sealed local road requests 18.8 58.2
Council says: Requests in 2024/25 have returned to similar levels to the years prior to the 2022 flood which led to a higher number of sealed local road requests in the year following.
R2 Sealed local roads maintained to condition standards 1.0 1.0
R3 Cost of sealed local road reconstruction 469.3 132.1
R4 Cost of sealed local road resealing 7.0 19.9
Council says: The cost for road resealing remains consistent with the previous year’s results.
R5 Satisfaction with sealed local roads 47.0 50.5
Council says: The Community Satisfaction Survey result for sealed local roads 2025 is consistent with the previous year and reflects an increase in satisfaction. Council continues its focus on road maintenance in line with community expectations. The result is 6 points higher …
Statutory Planning 4 indicators ▾
ID Indicator Result State Avg Trend
SP1 Time taken to decide planning applications 65.0 72.3
Council says: While reviewing this year’s data sources it was identified that last year’s input average used statutory days which is different from the collection of Planning Permit Activity Reporting System (PPARS) data. Last year should have been 64 which would result …
SP2 Planning applications decided within required time frames 0.8 0.7
SP3 Cost of statutory planning service 2645.5 3907.9
SP4 Council planning decisions upheld at VCAT 1.0 0.6
Council says: During the 2024/25 period only one Council decision was resolved at VCAT, upholding Council's decision.
Waste Collection 4 indicators ▾
ID Indicator Result State Avg Trend
WC2 Kerbside collection bins missed 0.7 6.3
WC3 Cost of kerbside garbage bin collection service 144.1 145.4
Council says: Costs decreased slightly compared to 2023/24 due in part to a reduction in waste tonnage.
WC4 Cost of kerbside recyclables collection service 77.7 76.8
WC5 Kerbside collection waste diverted from landfill 0.5 0.5
Council says: While the ratio of kerbside collection diverted from landfill decreased in 2024/25 compared to the previous year, overall there has been a total reduction in tonnage of material collected through the kerbside streams. An increase in Food Organics Garden Organics …