Corporate – City of Melbourne (Melbourne)
Original TEI
$133.2m
Current TEI
$133.2m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
0.0 months
Original: Jun 2029
→ Jun 2029
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata