Original TEI
$464.6m
Current TEI
$464.6m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
24.0 months
Original: Dec 2023 → Dec 2025
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata