Caulfield Rationalisation Works (metropolitan various)
Original TEI
$236.7m
Current TEI
$223.4m
Cost Overrun
$-13.2m
-5.6%
Schedule Overrun
—
Original: Jun 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata