Original TEI
$115.0m
Current TEI
$115.0m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
18.0 months
Original: Dec 2024 → Jun 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.