Building a world class Geelong Performing Arts Centre (Geelong)
Original TEI
$140.0m
Current TEI
$140.0m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
12.0 months
Original: Sep 2023
→ Sep 2024
Cost Status
Unknown
Time Status
Unknown