Original TEI
$184.0m
Current TEI
$184.0m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
-36.0 months
Original: Jun 2027 → Jun 2024
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.