Original TEI
$286.3m
Current TEI
$286.3m
Cost Overrun
$0.0m
0.0%
Schedule Overrun
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.

Metadata

The TEI has increased by $274.909 million due to revised scope for detailed design and quantity surveying of additional treatment upgrades.