Barwon Heads Road Upgrade (Barwon Heads)
Original TEI
$365.0m
Current TEI
$358.8m
Cost Overrun
$-6.2m
-1.7%
Schedule Overrun
21.0 months
Original: Dec 2023
→ Sep 2025
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift
No timeline snapshots recorded yet.
Metadata