Original TEI
$340.0m
Current TEI
$332.0m
Cost Overrun
$-8.0m
-2.4%
Schedule Overrun
24.0 months
Original: Jun 2024 → Jun 2026
Cost Status
Unknown
Time Status
Unknown
Cost History (TEI over time)
Timeline Drift

No timeline snapshots recorded yet.